Solar Panel Warranty Claim Process
Last Updated: 2026-09-01
Consumer Rights & Claims

Solar Panel Warranty Claim Process in Pakistan 2026: 25-Year Linear Power Guarantee

By PSI Editorial  ·  11 min read  ·  Updated September 2026

Testing electrical open circuit voltage on solar panel for warranty claim inspection in Pakistan
PakSolarInsights

📋 Warranty Claim Essentials at a Glance

  • Product Workmanship Warranty: 12 to 15 Years (Covers manufacturing defects).
  • Linear Power Warranty: 25 to 30 Years (Guarantees >87.4% output in Year 25).
  • Turnaround Time for Replacement in Pakistan: 15 to 35 Business Days through official Tier-1 distributors.
  • Golden Rule: Always buy from Tier-1 AEDB-authorized distributors with matching serial tax invoices.

Atomic Summary: While Tier-1 manufacturers (Jinko, LONGi, Canadian Solar, Trina) offer 12-year product and 25-year performance warranties, over 40% of warranty claims filed by Pakistani homeowners get rejected due to lack of serial-matched invoices, unauthorized imports, or micro-cracks from walking on panels. Follow this verified 5-step process to secure a brand-new free replacement module.

Understanding the Two Types of Solar Warranties

Warranty TypeStandard DurationWhat Is Covered?What Is NOT Covered?
Product / Workmanship12 – 15 YearsDelamination, yellowing EVA, defective junction box, loose aluminium frame, bypass diode short.Glass breakage from hail/cricket balls, accidental drops during transport.
Linear Power Degradation25 – 30 YearsPower dropping faster than guaranteed curve (<% in Year 1, <0.4%–0.55%/yr thereafter; >87.4% in Year 25).Temporary power loss due to unwashed dust, smog, or external tree shade.

Step-by-Step Claim Filing Procedure in Pakistan (2026)

Step 1: Perform Preliminary On-Site Electrical Tests

Before contacting the dealer, isolate the underperforming panel and conduct these three measurements using a calibrated digital multimeter at midday (11:30 AM to 1:30 PM):

Step 2: Collect Required Photographic Evidence

Take 5 mandatory high-resolution photographs:

Step 3: Submit RMA Ticket to the Authorized Importer

Send the documentation package to the authorized Pakistani tier-1 distributor (e.g. Diwan International, Netracon, Reon, or your local EPC installer). The distributor validates the serial number in the manufacturer factory database and issues an official Return Merchandise Authorization (RMA) tracking number.

Step 4: Factory Flash Test & Module Replacement

The local distributor inspects the panel at their testing warehouse in Lahore or Karachi (performing I-V curve trace or Electroluminescence EL testing). Once the defect is verified, a brand-new replacement module of equal or superior wattage is issued within 15 to 30 working days.

Top 4 Reasons Warranty Claims Are Rejected in Pakistan

Frequently Asked Questions

How long does a solar panel warranty claim take in Pakistan?

Through official Tier-1 authorized distributors (Jinko, LONGi, Canadian Solar), replacement claims typically take 15 to 35 business days.

Who pays for labor and shipping when replacing a defective panel?

The manufacturer replaces the solar module free of charge. However, rooftop de-installation and local freight to the distributor warehouse are generally handled by the homeowner or the installation EPC contractor under their initial 1-year free AMC service contract.


Related: How to Check Original Panels · Tier-1 Panel Brands · Hotspot Prevention