Net Metering Application Process in Pakistan (2026): Step-by-Step Guide
By PSI Editorial · 6 min · Updated August 21, 2026
💡 Quick Summary & Key Takeaways
- Total Timeline: 4 to 8 Weeks from filing to meter energization
- Eligibility: Active 3-Phase consumer connection with no outstanding dues
- Key Approvals: DISCO Sub-Division NOC, Load Flow Study, NEPRA Generation License
- Typical Turnkey Paperwork Fee: PKR 70,000 – 110,000
1. Step 1: Preparation & Certified Solar Vendor Selection
Under NEPRA Net Metering Regulations (SRO 892(1)/2015), only AEDB/PHEA accredited Category C-3, C-2, or C-1 installers can submit net metering files. Your vendor conducts a site feasibility survey and designs a system matching your sanctioned load.
2. Step 2: DISCO Application & Load Flow Study
Your installer submits the application dossier to your local sub-division (LESCO, IESCO, FESCO, GEPCO, K-Electric):
- Application Form-I with CNIC, title deed, and electricity bill.
- Single Line Diagram (SLD) signed by a professional PEC engineer.
- Inverter and panel test certificates matching NEPRA approved equipment list.
- DISCO conducts a Load Flow Analysis on the local distribution transformer to ensure solar penetration does not exceed 80% transformer capacity.
3. Step 3: DISCO Inspection, NEPRA License & Green Meter Commissioning
Once the NOC is issued:
1. Site Inspection: DISCO engineers inspect DC/AC isolator switches, SPD boxes, and earthing pit resistance.
2. Agreement Signing: Tripartite or bilateral Distributed Generation Agreement signed with the DISCO.
3. NEPRA License: NEPRA issues your formal Distributed Generation License.
4. Meter Replacement: DISCO testing department replaces the unidirectional meter with a bidirectional green meter and energizes the connection.
Frequently Asked Questions
How long does the complete net metering process take in Pakistan?
The process typically takes 30 to 60 days from initial application submission to final bidirectional green meter installation.
Who applies for net metering — homeowner or installer?
In Pakistan, AEDB/PHEA certified solar EPC contractors handle the technical design, load flow study, DISCO liaising, and NEPRA documentation on behalf of the homeowner.
What is the minimum system size for net metering?
The minimum sanctioned solar system size for net metering under NEPRA regulations is 3kW (requires a 3-phase meter connection).