Net Metering in Pakistan (2026): Green Meter Application, Policy & Billing Guide
By PSI Editorial · 8 min read · Updated August 21, 2026
⚙️ Net Metering Key Facts (2026)
- Regulatory Body: NEPRA (National Electric Power Regulatory Authority)
- Green Meter Connection Cost: PKR 75,000 – PKR 130,000
- Processing Duration: 30 to 60 Days
- Regime Type: Net Billing (Export credit rate ~Rs 11–13 / unit)
Net metering allows residential, commercial, and industrial solar owners in Pakistan to connect their grid-tied or hybrid inverters to the national power grid using a bidirectional Green Meter. Excess electricity generated during sunny daytime hours is exported to WAPDA/DISCOs, offsetting imported units on your monthly bill.
1. Step-by-Step Green Meter Application Process
- Step 1 — Hire an AEDB Certified Installer: Net metering applications must be submitted by an Alternative Energy Development Board (AEDB) certified solar installer (Category C-1, C-2, or C-3).
- Step 2 — Load Sanction & Document Preparation: Prepare your sanctioned load documents, CNIC copy, recent electricity bill, inverter test reports, and panel flash test certificates.
- Step 3 — Application Submission to DISCO: File the application at your local DISCO sub-division office (LESCO, GEPCO, FESCO, MEPCO, IESCO, PESCO, HESCO, QESCO, or K-Electric).
- Step 4 — Inspection & NOC Issuance: DISCO engineers conduct a site visit to verify inverter anti-islanding protection and earthing standards before issuing the NOC.
- Step 5 — Green Meter Installation: Pay the official demand notice and DISCO teams install the bidirectional green meter.
2. Understanding NEPRA Net Billing Rules (2026)
Under NEPRA's updated regulations, new net metering connections operate on a Net Billing mechanism. Exported daytime solar units are credited at the national average purchase price (~Rs 11–13/unit), while imported nighttime grid units are billed at standard slab tariffs. To maximize ROI, homeowners should focus on daytime self-consumption or store energy in lithium battery banks.
Curious about policy details regarding net metering bans or rumors? Check our policy update article: Is Net Metering Banned in Pakistan?.
Frequently Asked Questions
How much does a green meter cost in Pakistan?
A bidirectional green meter connection package in Pakistan costs between PKR 75,000 and PKR 130,000, including meter testing fees, AEDB verification, and DISCO charges.
How long does net metering approval take in Pakistan?
The entire green meter application and commissioning process typically takes between 30 and 60 days depending on your local distribution company.
Calculate monthly bill savings under net billing: